Empathise and engage

If there’s one thing we’ve learned makes better buildings, it’s empathy. Architecture never happens in isolation—and simply by being interested and engaged, we’ve found it’s possible to open up the conversations that connect a scheme to its clients and community.

Weconstraints

We believe that the more constraints there are, the better the architecture. If there aren’t any constraints, we create them. Challenging sites, existing buildings and complex briefs almost always present incredible opportunities for great design.

Passive future

To limit our environmental impact, we start with what is already there. By manipulating the form and fabric of a building—whether new or existing—we can work with the existing conditions of topography, light and orientation, and harness the natural energy sources offered by air, ground and water.

Social detail

If a site’s constraints guide the bigger design decisions, then it’s empathy that informs the smaller, social details. These details frame the human narratives that aren’t included in the brief, anticipating specific moments in the users’ lives.

Mud on our boots

Good architecture is as much about what happens on the building site as it is about what’s on the drawing board. By working alongside contractors as well as clients we can ring-fence the ideas and details that matter, championing quality and sustainability throughout construction.

Marsh Lane Electric Changing Centre
WorkStudioActivityNewsContact
Curl la Tourelle Head
Work
  • Marsh Lane Depot

Client
  • London Borough of Haringey

Curl la Tourelle Head Architecture has been green-powering Haringey!

CLTH designed this large-scale infrastructure project on behalf of the London Borough of Haringey. This extensive industrial site has been converted for electric vehicle repairs.

More news coming soon!

Related works

Curl la Tourelle Head
Research & Action Laboratory, Windermere
Curl la Tourelle Head
Closed Loop System Proposal, Pegwell Bay
Curl la Tourelle Head
Twickenham Civic Centre
Curl la Tourelle Head
Welsh Harp Urban Farm, Brent
Curl la Tourelle Head
Tertiary Level Treatment to the Sanitary Waste, River Mersey, Liverpool
Curl la Tourelle Head
Marsh Lane Electric Changing Centre

Curl la Tourelle Head

+44 (0)20 7267 0055

mail@clth.co.uk

Follow us
  • Instagram: cltharchitecture

  • Pinterest: @CLTHArchitecture

  • LinkedIn: Curl la Tourelle Head Architecture

Download
  • > Inclusivity statement

  • > Practice Plan

  • > Environmental policy

  • > Selected Projects - Built Brochure

  • > Selected Projects - Unbuilt Brochure

  • > Housing Brochure

  • > Conservation Brochure

  • > Social Value Brochure

  • > Education Brochure

Job opportunities
  • Contact: mail@clth.co.uk

Curl la Tourelle Head © 2025 Design & Art direction: BOB DesignWeb development: Official Business